Brick Name – Cranleigh Light Multi
Site Details – Finchley, N3
Contractor – GPF Lewis
Architect – SUSD
Project details – the development of the URC church was to be converted into 3 two storey homes plus the refurbishment of the church along with side and rear extension. The Architect was looking to find suitable bricks that would match the existing building and we were asked to submit suitable options in order to reduce the change to the external appearance of the local landmark.